Industrial

Industrial

Ziegenfelder Company

Production / Freezer Addition

  • Cost: $8,000,000
  • Size: 40,000 sq. ft.
  • Completion Date: 2009
  • The design of Phase One of this addition helped improve packaging / shipping operations and dramatically increased on-site freezer storage capabilities. Phase Two, which is on the boards, will streamline the production process as a whole and provide needed on-site dry storage.



Bayer Material Science

Research Building Renovations

  • Cost: $1,600,000
  • Size: 40,000 sq. ft.
  • Completion Date: 2007
  • The design of this renovation adaptively reused an existing two story research lab building to create office space for several plant departments including training and conference areas, library and first aid station.

Bayer




Bayer Material Science

Central Maintenance Shop Renovations and Expansion

  • Cost: $2,800,000
  • Size: 27,000 sq. ft.
  • Completion Date: 2008
  • The design of this facility consolidated the maintenance operations of the plant under one roof by constructing a connector building between two existing maintenance buildings to provide space for all plant maintenance activities as well as training / conference areas and locker rooms.

Bayer




Washington Penn Plastic Company

Prototype Manufacturing Facility

  • Total Size: 189,670 sq. ft.
  • Completion Date: 2010
  • The design of this prototype facility linked two different aspects of Washington Penn’s production capabilities together into one facility in order to share common warehouse storage, shipping, maintenance and office spaces accomplishing an efficient use of space and staff while reducing transportation and shipping costs. The initial application of this prototype will occur overseas in Slovakia.

Washington Penn Plastics




Washington Penn Plastic Company

Frankfort Manufacturing Facility Renovations

  • To be completed: 2011
  • The design of this renovation includes the addition of several pad mounted raw material silos, elevated finished product silos and the retrofit of an additional production area that requires the construction of an elevated roof area in the middle of an existing 45 year old structure.

Washing Penn Plastics